How much does it cost to dig out a basement?
There is no single credible figure for basement digging cost. It turns on the method (convert a dry cellar, lower a floor, or dig a new box), depth, spoil route, ground and water, and waterproofing. Restricted-access city sites, London especially, sit well above the rest of the country for identical work. Fix the scope in writing; get three quotes.
How much does it cost to dig a basement under an existing house?
9 of the 33 builders' and designers' pages we read on 11 October 2026 price a new basement per square metre. Median £3,000, middle half £2,500 to £4,675, range £1,500 to £7,200. The top is a London dig under an occupied house, spoil out by hand. 23 publish no price. See the UK Basement Price Index.
What do basement digging contractors need to price the job?
The method (convert, lower or dig new), finished headroom, spoil route, ground and water table, and waterproofing type. Have every contractor price one written scope and list exclusions. Usual gaps: structural and temporary works design, party wall surveyor fees, skip and highway permits, the fit-out. A basement dig without a site visit is not a price.
What is the most expensive part of a basement project?
On a restricted-access site, excavation and spoil removal, because everything has to be handled by labour rather than machines. On an open site, the structural and temporary works package usually leads. Waterproofing is rarely the biggest line but it is the one most likely to cost you again later if it is specified cheaply.
Do I need a structural engineer for a basement?
Yes. Underpinning, retaining structure and the temporary works that support the house while you dig all need designing by a structural engineer, and building control will expect calculations. Treat any contractor who offers to do it without engineering design as a serious warning sign.
How long does a basement excavation take?
Longer than the dig itself suggests, because the sequence matters more than the volume. Site investigation, structural and waterproofing design, planning where needed, building regulations, and at least one month of party wall notice before excavation begins all come first. Sequenced underpinning is deliberately slow work, and restricted access lengthens it further.
Will a basement add more value than it costs?
Not reliably, and we will not pretend otherwise. New basement space is normally the most expensive way to add floor area to a house. Whether the finished value covers it depends entirely on local values per square metre. Basements make sense where there is no other way to gain space; check the arithmetic against local sale prices first.
Is this quote service really free?
Yes, free to you and with no obligation to accept any quote. We pass your details only to underpinning and basement contractors, who quote you directly. We may receive a fee from those providers, which is how the service is funded.